06 — Services
Reinforcement and preparatory work
Reinforcement mesh, bent bar and excavation preparation before casting.
The work before the concrete. Reinforcement tied to the drawing, the excavation prepared, and everything checked before the casting day.
What it includes
- 01Reinforcement mesh and bent bar
- 02Tying to the reinforcement drawing
- 03Spacers and cover checks
- 04Excavation preparation and compaction
- 05Control survey before casting
Technical note
Concrete cover is checked before casting — too little corrodes the reinforcement, too much weakens the structure.
Shall we look at your job?
Send a drawing or a description — we assess the scope and send a quote.